FRANK ANDREE Houston, Texas 77304 936-697-5058 www.linkedin.com/in/frankandree frank_andree@hotmail.com CAREER
SUMMARY Extensive 20 year International field
operations record with progressive leadership roles and project support
levels. Initiative based and positive leader with
ability to develop ideas into organized actions and deliver tangible results.
Experienced with Motorola, Nokia, Ericsson
& Nortel projects including T-Mobile, AT&T, Bechtel and Sprint.
KEY SKILLS Site Construction &
Installation
Special Projects & Tiger Team Site Survey & Quality
Assurance
A&E Site Design & Development Heavy Equipment & Crane Wrangler
Logistical & Distribution Expeditor Rollout & Deployment
Leadership
Hardware Installation / New Hire Trainer PROFESSIONAL
SUMMARY VERIZON
LOUISIANA 2014 Regional Install
Manager Precons, Install,
Q&C of AWS & LTE BTS cabinets / BBU / TMA Tower component
upgrades and PIM testing. GENERAL DYNAMICS /
AT&T
WESTERN REGION U.S.A 2013 Logistic Manager * Organized vendor points to warehouse
inventory to distribution for tower crews on a microwave network
upgrade. * Created and tracked Mw / Towers B.O.M.’s,
AT&T engineering change orders and shelter - tower redlines updates. * Reduced down time by reducing civil work inventory
matched site drawing manifests across seven market states simultaneous.
NOKIA
/
T-MOBILE
DALLAS, TX 2012-2013 Field
Manager *
Consistent leadership of 6 BTS-Tower field crews & equipment distribution
on LTE site upgrade & decom phases. *
Liaison on pre-cons, - redlines. A&E firms / property managers / city
& municipal engineer’s dept. / material distribution. *
Initiated a 1-2 day onsite RF Mod –Hybrid - PIM test problem-solving class
for new hires and share latest punch-items. * Concentrated on
identifying the problem and not the blame in achieving fluid customer network
goals. ERICSSON –Sprint /
AT&T
NATIONWIDE 2011- 2012 Construction
Manager 2 * Field liaison for
Fiber to Site FTTx walks, accurate redline & audits data and ensured open
source reporting of upgrades. * My Team Motto was
Lets Not Make the Same Mistake Twice and stressed Keep It Simple Solutions. CLEARWIRE /
Motorola
-Sprint
NATIONWIDE 2008- 2011 Field Coordinator /
Quality Assurance Mngr * Created pre-install site audits / BTS
& Ant install quality thru to final closeout folder process./ Bechtel
Team Liaison * Project Lead on design- construct &
install of MOTO LMR E911 system test cell for Dept.of Defense R&D
laboratory. * Wimax network hardware install –power up
- commission on several regional pilot start up projects. T-MOBILE –
NOKIA,
ALABAMA 2008 Field Coordinator * Liaison for
Alabama Utilities electric service cell site upgrades. Organized Flexi
hardware install & testing by field techs. ARMY CORPS OF
ENGINEERS,
IRAQ 2007 Team Leader of 16
man mobile security unit for Corps of Engineer / E.O.D team missions. MOTOROLA /
Alltel
TEXAS / ARKANSAS 2006 Install,
commission, calibration & testing SC-4128 BTS starter / expansion frames.
Considerable re-cabling of sites. NOKIA-SIEMENS /
FLEXTRONICS
UKRAINE
2005
Deployment
Manager * Assigned by
Country Manager to organize a Tiger Team to identify-resolve site development
continuity. * Direct leadership
80 person group supporting new site / tower construction & install /
prefab shelters and logistics. * Reorganized and
revitalized a struggling prefab comm shelter production to hardware install
to site delivery operation. * Evolved into
‘‘GO-TO’’ P.O.C. regarding inter-dept. scope of work problem solving and
special projects point man. RESEARCH TRIANGLE
INSTITUTE,
IRAQ 2003 – 2005 Ops Liaison / Team
Leader 2 I.C. *Active Close Protection for Coalition
Govt. staff, USAID Principles and Iraqi Interim Govt. officials and tribal
leaders. AT&T WIRELESS
NATIONWIDE 1999
– 2003 Project Lead / PM2 * New Build site
construction, survey and shelter design / layout and supervision of general
contractors and vendors. * Conducted network
site survey and hardware audit to prepare for a 2100-2200 BTS series network
upgrade. * Advance Team
leader establishing a new market, guiding the infrastructure – logistical
support process. MOTOROLA
CZECH REP, NIGERIA, SO. AMERICA 1996-1998 Field Supervisor * Special projects
team utilized by MOTO PM to tackle and resolve daily const-install problems
and obstacles. * Project Advance
Team developing turnkey infrastructure group for new build construction &
installs. * Design team
member of Construct -Install S.O.P. –M.O.P. for a prefab comm shelter vendor
supporting Czech Market. * Successful field
issue resolution directly for Moto’s PM team regarding site development. QUALCOMM /
NORTEL,
CALIFORNIA & SIBERIA 1996 Deployment Manager Pioneered a 1st gen. CDMA SYSTEM
from R&D to Test Phase to overseas onsite implementation. Supervised the
design and construction of network test lab facility for client and vendor. Acted as project
interface and expeditor between Nortel engineering and Qualcomm Management
Group. NORTEL, ERICSSON,
MOTOROLA,
HUGHES,
NATIONWIDE & ISRAEL 1994-1996 Crew Leader /
Installation Technician Site survey and
design, install and power up of BTS hardware, new site construction and
material distribution. EXXON, ARCO, B.P.
AND
FMC
TEXAS 1990-94 Field Tech,
Boilermaker, Roughneck Pipeline Cathodic
engineering, land rig drilling / plant electrical –power install / heavy
civil construction and shutdowns. TRAINING NOKIA:
Flexi UMTS Course / Atlanta, Ga. [PTID# 001LEM03537] AT&T Wireless
Construction / Install Quality Standards Training AT&T ‘RED CARD’
& SUPPLIER AWARENESS CERT. MOTOROLA:
EVDO – CDMA 2000 F.E.Course. / Schaumberg, IL QUALCOMM:
CDMA Deployment Course / San Diego, Ca. NORTEL: BTS
Installation Course, Los Angeles, Ca. WIRELESS HARDWARE
EXPERIENCE & CERTIFICATIONS QUALCOMM: CDMA BTS /
San Diego, Ca. NOKIA L.T.E. /
Flexi Cabinet CLEARWIRE WIMAX
CABINETS ERICSSON: RBS 3100-
2106-2206-series 884-882 880 series NORTEL:
NT800-S6000- URBAN-METRO BTS MOTOROLA: SC4812 /
GSM 900 / LMR, Tetra & Horizon / HD2 BTS series ALCATEL LTE / AWS
BTS Cabinets F.E.M.A., National
Incident Management System Ventura Adult
Learning Center Microsoft Office Suite Courses, Ventura Calif OSHA Safety Courses
and forklift – manlift training 2013-2014 Myers Briggs Type
Indicator Course / ENTJ - Blue UNITED STATES
MARINE CORPS 1980-1984 INFANTRY SQUAD
LEADER – FLEET MARINE FORCE. High Risk Security